Lehigh Valley Management recently scrapped most of the Bethlehem Steel era switchers that were stored in their yard for over 20 years. A 1957 built SW1200 and 1951 built SW9 appear to be all that'... (more)
PBNE 43 sits among other power at Bethlehem Steel's engine house in Bethlehem, PA. Tim Howeter photograph, collection of Colin Kund.
The LVRM conductor is cutting away from his train to get in the clear for the NS crew to tack on 2 C40's and head to Rutherford, PA..
Dropping down past the old Bethlehem Steel plant, PB&NE SW1200's 43-42 bring down 63 roadrailers for interchange with the NS..
A PBNE SW 1200 sits idle in the late afternoon sun. This is one of many SW 1200's that are utilized by The Lehigh Valley Rail Management.
Unlikely leaders for a double stack train? PB&NE ancient switchers tote out a stack train for NS to pick up later this afternoon out of the river tracks at Bethlehem.
PBNE 43 and 42 bring roadrailers out to CP-88 that will become NS 261.
PBNE 43 and 42 switching intermodals into yard
PBNE 43 and 42 shove a cut of cars left by an earlier NS 24Z
A pair of EMD switchers move into position, awaiting the arrival of the Road Railers on NS 212.